Establishment of a Science Center in the Debrecen Botanical Garden
Establishment of a Science Center in the Debrecen Botanical Garden” TIOP 1.3.3/08/2-09-0002 code name project, independent engineering (engineering consultant, contractor) and technical supervision.
Basic Data:
Client: Local government of Debrecen
Contractor: HUNÉP Zrt
Construction budget:
Part 1: 999 790 000 HUF
Part 2: 23 100 000 HUF
Part 3: 31 363 500 HUF
Timeline:
Contract: 2010.08.03
Implementation: 2014.03.31
Guarantee period: 2017.03.31
Project brief:
Auditing of the technical implementation of the following project elements:
Part 1: Construction of the Palace of Science (2845,06 m2) and related development elements
Part 2: Renovation and conversion of the Observatory building (68,04 m2), Renovation of the Laboratory Animal Core Facility (358,45 m2)
Part 3: Awadukt-Thermo ground-air heat exchanger system
Main quantities, technical parameters:
Part 1: Construction of the Palace of Science and related development elements: Construction of temporary road 953 m2, Demolition of isotope laboratory (1462,33 m2) and hazardous waste storage building (50,26 m2), Construction of Palace of Science building (2845,06 m2), Construction of pond, surface: 728 m2, Construction of an educational trail (310 m2), Construction of an information, cashier and reception building (8.01 m2), External utilities (storm drain 126 m, sewer, 80 m, drinking water pipe 200 m, leakage pipe 75 m, connection of district heating 15 m, access control system, structured IT network, intercom system and backbone cabling 900 m)
Part 2: Renovation and modification of the Observatory building (68,04 m2), Renovation of the Laboratory Animal Core Facility (358,45 m2)
Part 3: Awadukt-Thermo ground-air heat exchanger system (554 FM Thermo tube, 126 additional batteries)